The Baumit System can be applied on many different types of carrier board, such as:
It is the customer responsibility to check with the board manufacturer and the Baumit technical team that a render system can be applied to it.
The overall installation of the board must be applied as manufacturer manual.
Stage 1 | Apply Basecoat, Reinforcement Mesh & Beading/Profiles 1 coat of Baumit StarContact to a thickness of 5-6mm with a layer of reinforcement mesh embedded into the basecoat. All beading must also be placed and embedded into the basecoat. Consumption: Basecoat – 4.5/5.5KG per SQM Approximately 4 SQM per 25KG bag Reinforcement Mesh: 50 SQM per roll Drying time: 1MM per day | Basecoat Baumit StarContact Or Baumit MC 55 W Reinforcement Mesh Baumit StarTex Mesh Beading/Profile Baumit Corner Bead Baumit Window Profile Baumit Stop Bead 3MM/6MM Baumit Drip Bead Baumit Movement bead More beads available |
Stage 2 | Apply Primer 1 coat of primer brushed, or roller applied. Consumption: 75 / 100 SQM per 25KG bucket Drying time: 24 Hours | Primer Baumit UniPrimer Or Baumit Premium Primer |
Stage 3 | Apply Render finish 1 coat of render applied with a flat plastic trowel. Consumption: 8.5/10 SQM per 25KG bucket Drying time: 24/48 Hours | Choose from our Baumit Renders Baumit GranoporTop (Acrylic) Baumit SilikonTop (Silicone) Baumit NanoporTop (Mineral, Self-cleaning) Baumit Puratop (For Dark Colours) And more available |
Our Technical Team is here to support you.
Please contact a member of the Technical Team before beginning your project